The State Patrol Ticket Processing System
Question description
page 1 book 199.jpgpage 2 book 199.jpg
CIS 510 – Extra Credit.
Extra credit requires you to use all of the concepts discussed in this course. There are sections with each section having point value. You must have all elements required in each section to receive points for that section. All diagrams must be part of your System Review document placed in the appropriate section. The format is included in this document.
Extra credit the case study “The State Patrol Ticket Processing System” (Page 199, Chapter 5). There are five independent systems.
1) Ticket Processing System
2) Accident and Insurance Verification System
3) Driving Record System
4) Driver License System
5) Patrol Operations
The first four systems are integrated and share a common database; however, each processes only data specifically identified for the system. This project has a $150,000 budget and must be completed within 4 months. You currently have a staff of two programmers, one tester, one network adminstrator, one database adminstrator, and a State Trooper Officer as a liason.
Extra Credit Project (150 points):
Your team is required to integrate the Patrol Operations system with the other four. Patrol Operations include all information of the State Trooper (Name, address, Badge Number, Rank), vehicle assigned (Type, VIN, State Number), and patrol area. Sections 1 and 2 are traditional design approach requirements. Sections 3 and 4 are Object- Oriented design requirements. Section 5 will be a full project scope statement.
SYSTEM REVIEW DOCUMENT
PROJECT: State Trooper Multi-System Integration
SYSTEMS ANALYST: <Your Name>
PROJECT MANAGER: <Your Name>
CLASS: CIS510 – SPRING QUARTER
Section 1: Entity Relationship Diagram – Visio or Open Source version (30 points)
a) Current System (15 points)
b) Upgraded System (15 points)
Section 2: Data Flow Diagram – Visio or Open Source version. (30 points)
a) Current system (15 points)
b) Upgraded system (15 points)
Section 3: Class Diagram – Visio or Open Source version. (30 points)
a) Upgraded system
Section 4: Use Case Diagram – Visio or Open Source version. (30 points)
a) Upgraded system
Section 5: Project Scope Statement (30 points) – Use the format below.
Project Name: State Trooper Multi-system integration
Department: State Trooper IT Division
Project Manager: <Your Name>
Date: <Date>
Prepared By:
Document Owner(s) | Project/Organization Role |
<Your Name> | State Trooper Integration/Systems Analyst/Project Manager |
Project Closure Report Version Control
Version | Date | Author | Change Description |
01 | <Date> | <Your Name> | Created document. |
Project Justification (6 points)
|
Project Identification (6 Points)
|
Project Deliverables (6 points)
|
Project Objective (6 points)
|
Assumptions/Limitations (6 points)
|